EPS
← All tasks·#27Archived

[Running] Aim 2-3: Comprehensive Trait Leakage (Phase A1)

kind: experiment

From EXPERIMENT_QUEUE.md — Running (started 2026-04-14)

Plan: .claude/plans/shimmying-hopping-locket.md (v3, 2 adversarial review rounds).

Phase 0.5 pilot COMPLETE: Gate PASS (rho=0.56, p_one=0.058, n=9 excl zelthari).

Phase A1 COMPLETE: 44/44 runs done (40 persona-conditioned + 4 controls).

  • Results: rho=0.60 (p=0.004), partial r=0.66 (p=0.004). Capability rho=-0.40 (n.s.)
  • Controls: shuffled persona eliminates gradient (rho=-0.006); cap hierarchy: persona-cond (4.0%) > generic (1.6%) > shuffled (0.5%)

Draft: research_log/drafts/2026-04-14_phase_a1_analysis.md (reviewer fixes + control analysis applied).

Next: Commit + push → Phase A2 (multi-seed replication with seeds 137, 256, 512).

Timeline · 0 events

No events recorded.

Comments · 0

No comments yet. (Auth + comment composer land in step 5.)